Ontario Building Permit Guide 2026: What You Need and What It Costs
March 18, 20269 min
Ontario Building Permit Guide 2026
When Do You Need a Permit?
Permit Required:
No Permit Needed:
Permit Costs in Ontario
|-------------|-----------------|
Typical permit costs:
Timeline
Common Mistakes
For a detailed cost estimate including permit fees, try our free estimator.
- Structural changes (wall removal, additions)
- New plumbing or plumbing relocations
- Electrical panel upgrades
- New windows/doors in load-bearing walls
- Basement finishing (if adding bedrooms)
- Deck over 24" above grade
- Roof structural changes
- Cosmetic renovations (paint, flooring, fixtures)
- Cabinet replacement (same layout)
- Fence under 6.5 feet
- Replacing windows (same size, same location)
- Minor repairs
| Municipality | Residential Rate |
|---|---|
| Toronto | $7.50–$12.50 per sqft |
| Ottawa | $6.00–$10.00 per sqft |
| Mississauga | $6.50–$11.00 per sqft |
| Hamilton | $5.50–$9.00 per sqft |
| London | $5.00–$8.50 per sqft |
- Kitchen renovation: $300–$600
- Basement finish: $500–$1,200
- Addition: $1,500–$5,000
- New build: $5,000–$15,000+
- Application: 1-2 weeks to prepare drawings
- Review: 10-30 business days (varies by municipality)
- Inspections: At each stage (framing, rough-in, insulation, final)
- Final inspection: Required before occupancy
- Starting work before the permit is issued
- Not scheduling inspections at each stage
- Making changes without updating the permit
- Letting the permit expire (usually valid 6 months to 1 year)
Want a real price for your project?
Send BuildSmarts your photos, plans or project details and we'll review the scope and quote the work.